Home > > News

Operation Rules of Rotary Piling Rig I

Dec. 05, 2017

1.Rotary Piling Rig working plat form is relatively flat, the site is dense and the rig can turn to normal.

2.Check the performance and condition of the engine, hydraulic system, drilling tool and wire rope before starting the engine. During the winter construction, the rotary piling rig must preheat the engine for more than half an hour, when the temperature reaches the specified value, it can start the engine.

3.Work for half an hour before working in order to ensure the parts are connected correctly and the temperature of the oil is normal.

4.In working must always check the instrument display, observe the condition of the main wire rope, ensure the verticality so as not to affect the quality of hole. Always check the soil condition, to  ensure the drilling progress.

5.When drilling, we must first select the location of the waste, so as not to affect the rotary motion of the Rotary Piling Machine. Often check the condition of the drilling tool.

Rotary Piling Rig

Recommending: Operation Rules of Rotary Piling Rig II


Xuzhou Reman Construction Machinery Remanufacture Co., Ltd.

Copyright © Xuzhou Reman Construction Machinery Remanufacture Co., Ltd. All Rights Reserved

Sitemap